Funding
The funding check shows you which funding could suit your project. It gives you pointers – the application is yours to make.
Climate protection has long been law
-
by 2030
−65 %
Greenhouse gas emissions compared with 1990
-
by 2040
−88 %
Greenhouse gas emissions compared with 1990
-
from 2045
net zero
Greenhouse gas neutrality
To get there, the federal government subsidises energy-efficient renovation through the Bundesförderung für effiziente Gebäude – BEG (Federal Funding for Efficient Buildings). It covers replacing the heating system, work on the building envelope and building services such as ventilation, refrigeration and building automation. The conditions were last revised with effect from 21 July 2026.
Sustainability touches every part of a business, from saving energy and going digital to converting the heating. The funding check just below gives you a first orientation.
Funding check
Which funding fits your project?
Three answers are enough for a first assessment: which programmes could apply, what subsidy you can expect and what to look out for.
Important: taskrunner does not apply for funding and does not support you with applications. The funding check is only meant as a first orientation. Whether you receive funding, and how much, is decided by the funding body – such as BAFA or KfW.
You will find all programmes and their conditions further down.
Your result
As soon as you choose a project, you will see here which funding could apply.
For every programme: apply first, then place the order. For heating, building envelope and building services, an energy efficiency expert also prepares the technical project description.
Non-binding information, not funding advice. As of September 2026, without guarantee.
The programmes in detail
First, the key points on the Bundesförderung für effiziente Gebäude: what applies and what has changed since July 2026. You will find the details under each programme.
Heating, envelope, building services
Requirements
- The application must be submitted before the project starts
- The technical project description is prepared by an energy efficiency expert
- Approved projects must be carried out within the deadline stated in the approval notice
New since 21 July 2026
What has changed
- The efficiency bonus for heat pumps has been dropped
- The emission reduction supplement for biomass heating has been dropped
- Energy-efficient interior lighting in non-residential buildings is no longer funded – see building services for alternatives
- New applications to KfW require a new TPB ID (technical project description ID)
- Applications to KfW were suspended from 9 to 20 July 2026; they have been possible again since 21 July
Applied for via KfW
Heating subsidy
30 % basic funding on eligible costs
Converting the existing heating system lowers energy costs in the medium to long term and improves energy yield. The heating subsidy no longer runs through BAFA but through KfW.
Funding amount
- 30 % basic funding on eligible costs
- There are no bonuses for companies or let properties – it stays at 30 %
Eligible costs
- Up to 150 m² net floor area: €28,000
- 150 to 400 m²: an additional €197 per m²
- 400 to 1,000 m²: an additional €118 per m²
- Over 1,000 m²: an additional €79 per m²
Applied for via BAFA
Building envelope subsidy
15 % subsidy, specialist planning and construction supervision 50 %
Good thermal insulation is as much a part of climate protection as an efficient heating system. Renewing the heating alone rarely achieves much if the heat escapes from the building. That is why the building envelope subsidy usually goes hand in hand with the heating subsidy. It also makes sense as a stand-alone measure.
Who is eligible
- Companies
- Legal entities
- Owners’ associations
- Regional authorities and municipalities
- Non-profit organisations
What is funded, and how much
- Work on the building envelope, such as insulating exterior walls and roofs, and renewing, replacing or installing doors, gates and windows for the first time: 15 %
- iSFP bonus (individual renovation roadmap) of 5 %, only for residential buildings and only on expenditure above €30,000
- Specialist planning and construction supervision: 50 %
- Components must meet minimum requirements, depending on the type of component and how it is installed
Eligible costs
- €30,000 per residential unit
- With an individual renovation roadmap, up to €60,000 per residential unit
- Separate caps apply to non-residential buildings
Applied for via BAFA
Building services
15 % subsidy, heating optimisation 50 %
Besides heating and the building envelope, the federal government funds the technical equipment of the building. This mainly means ventilation, refrigeration and building automation – exactly the trades that account for most of the electricity used in day-to-day operation.
What is funded, and how much
- Ventilation, refrigeration and building automation: 15 %
- Heating optimisation to reduce emissions: 50 %
- Specialist planning and construction supervision: 50 %
Lighting: funding discontinued
- Since 21 July 2026, energy-efficient interior lighting in non-residential buildings is no longer funded through the BEG
- This was due to short-term budget requirements; the application portal has been closed
- Alternatives include the Nationale Klimaschutzinitiative (National Climate Initiative), KfW loans, federal state programmes or contracting
Applied for via BAFA
Energy consulting
50 % of the consultant’s fee
Before you invest, an outside view pays off: where is most energy lost in the building and in operation? For non-residential buildings, plants and systems, the federal government subsidises this consulting.
Who is eligible
- Small and medium-sized enterprises
- Large companies using no more than 500,000 kWh of energy a year
- Municipalities and non-profit organisations
Funding amount
- Energy consulting under DIN V 18599: 50 %, up to €850 (under 200 m²), €2,500 (up to 500 m²) or €4,000 (over 500 m²)
- Energy audit under DIN EN 16247: 50 %, up to €3,000; with energy costs of up to €10,000 a year, up to €600
What to watch out for
- Only commission the consultant once funding has been approved
- You pay the full fee first; the subsidy follows
- Residential buildings have their own programme with an individual renovation roadmap
Applied for via BAFA
Pumps, motors, compressed air
20 to 25 % subsidy, only for small and medium-sized enterprises
In plant rooms, pumps, fans and compressors often run non-stop for decades. Replacing them with high-efficiency equipment is subsidised through the Bundesförderung für Energie- und Ressourceneffizienz in der Wirtschaft (Federal Funding for Energy and Resource Efficiency in Business), module 1: cross-sectional technologies.
What is funded
- High-efficiency electric motors, pumps, fans and compressed air generators
- Frequency converters to retrofit existing drives
- Heat exchangers that use waste heat from existing systems
- Insulation of existing systems
Funding amount
- Small companies: 25 %
- Medium-sized companies: 20 %
- Minimum investment €2,000, maximum subsidy €200,000
Who is eligible
- Small and medium-sized enterprises only
- Large companies, private individuals and municipalities are not eligible under this module
Loan via your bank (KfW)
Photovoltaics and storage
Low-interest loan, no federal grant
For solar systems on your own roof, there is no federal grant, but there is a low-interest KfW loan (Erneuerbare Energien – Standard, programme 270). Some federal states and municipalities offer grants.
What is funded
- Photovoltaic systems, including planning and installation
- Battery storage and other systems for renewable electricity
- Used systems too, but not plug-in balcony solar systems
Conditions
- Loan of up to 100 % of eligible costs
- You apply through your bank before you sign a contract
Applied for via ZUG
Lighting for municipalities
25 % subsidy, 40 % for financially weak municipalities
Now that the BEG no longer funds interior lighting, municipalities and non-profit bodies can still turn to the Kommunalrichtlinie (National Climate Initiative guideline for municipalities). It subsidises the switch to LED with demand-based control.
What is funded
- Indoor and hall lighting
- Outdoor and street lighting
Funding amount
- 25 % of eligible expenditure
- 40 % for financially weak municipalities and applicants from lignite mining regions
Who is eligible
- Municipalities and municipal companies
- Associations, educational institutions and other non-profit bodies
Where to apply
You apply yourself, always before the project starts: to BAFA, to KfW (loans via your bank) or, for the Kommunalrichtlinie, to ZUG. An energy efficiency expert prepares the technical project description.
As of September 2026. Information without guarantee – the guidelines and information sheets of the funding bodies in force at the time are authoritative. taskrunner does not apply for funding and does not give binding advice on it.